Creo Structures provided multiple professional engineering services at Werribee Pools.
Project 1: Tiling Refurbishment of the 50m Pool and Leisure Pool administered during the off-season between April 2021 and October 2021.
Project 2: Administered concurrently to Project 1, Creo supported Council in the second stage of the filtration upgrade to replace the existing 50m pool’s sand filtration system with a new pre-coat filtration system incorporating the installation of a Neptune Benson Defender Filter. This was administered between April 2021 and October 2021.
Project 3: This was administered the following year in the ‘off-season’, Creo designed and administered the structural repair and recoating of all outdoor concrete concourse pavements throughout the facility applying a new slip-resistant cement based coloured coating system across the existing concrete concourse pavement. This was administered between June 2022 and October 2022.
ClientWyndham City CouncilServicesAquatic EngineeringStatusCompleted 2022